Please contact Dr. Works (keworks@fsu.eu) for additional help: Submission navigation links for Research Symposium Program Portal WF ‹ Previous submission Next submission › Submission information Submission Number: 225 Submission ID: 9073 Submission UUID: 120b4a2b-8bc4-49fe-897f-ef87f8e5e97a Submission URI: /student-research/symposium/research-symposium-program-portal Submission Update: /student-research/symposium/research-symposium-program-portal?token=wYFj-9fKgpcRch-wPxR9YLWBp7jcRAGjXdD7y9MFdgA Created: Fri, 01/30/2026 - 09:39 PM Completed: Fri, 01/30/2026 - 09:40 PM Changed: Sun, 02/01/2026 - 10:32 AM Remote IP address: 2601:4c1:c400:61e0:78ef:da58:295e:b9a0 Submitted by: Anonymous Language: English Is draft: No Webform: Research Symposium Program Portal WF Submitted to: Student Research Symposium Program Portal Primary Student Contact First Name Primary Student Contact Last Name Pronouns Primary Student Contact FSU Student Email Photo of all individuals presenting this work Headshot (1).jpg27.69 KB Remove Upload requirementsOne file only.2 MB limit. Major(s) of all individuals presenting this work Bio of all individuals presenting this work N/A Poster Title Abstract Research Symposium Abstract The Pine Log State Forest Expansion involves the planning and design of numerous structures and amenities developed to support increased public use while preserving the site’s natural environmental character. The project is located in Washington County, Florida, just 14 miles north of Panama City Beach, on a site encompassing approximately 90 acres of mixed uplands, wetlands, and open-water features. Facilities include a two-story visitor center with an 80 ft 60 ft floorplan (9600 square feet total), a parking lot, a multi-use path, public pavilions, pedestrian bridges, a boardwalk, restroom facilities, and the associated utilities/roadway improvements. The project will consist of one stormwater retention pond located downslope of the parking lot and main visiting center area. The water flow will be directed towards the SWMF through natural drainage patterns and roadside swales. A wastewater lift station will also be implemented to reliably convey wastewater from the visitor center and restroom facilities to the designated treatment system. A natural vegetative buffer will also be present downslope of the pavilion area to protect the nearby wetland systems. Research Mentor Name Research Mentor's College (or High School) Research Mentor's Department (or Subject) Research Mentor's Email Additional Research Mentor(s) Co-presenter(s) Keywords Poster Session/Number Work Complete Exploratory (the research question has been identified and design of approach is outlined) Presentation Modality Face to Face Poster session Synchronous Online Presentation Asynchronous Online Presentation Poster PDF Upload Upload requirementsOne file only.100 MB limit. Poster Thumbnail Please take a screenshot of your poster to be a thumbnail on your Symposium Program Profile. Upload Upload requirementsOne file only.2 MB limit. I will be printing my poster CAPTCHA What code is in the image? Enter the characters shown in the image. This question is for testing whether or not you are a human visitor and to prevent automated spam submissions. Save Leave this field blank